Todd Field Construction.JPG

An overhead view of the renovation of Todd Field back in 2019. File photo

A second round of paver brick orders for McNamara Stadium at Todd Field will take place in the fall of 2021. Orders will be accepted from September 1 - November 1. Bricks will be installed on the plaza, just inside the main entrance, in the summer of 2022 (in time for the fall 2022 athletic season).  

Each brick contains a maximum of 3 lines, with a maximum of 18 characters per line. Almost 100 bricks already exist at the stadium, outside the main gate, and are available for public view if interested in seeing how other families and businesses designed their text.

One brick is $90 and there are multi-brick discounts available. 

Orders and payments are due by November 1, 2021. Orders and payments are both submitted online - but require two different links. One link is to place your order and submit the text you want on your brick. The second link is to submit payment. Thanks for your understanding and cooperation with two separate links. 

Order Link can be found HERE

Payment Link can be found HERE

(0) comments

Welcome to the discussion.

Thank you for taking part in our commenting section. We want this platform to be a safe and inclusive community where you can freely share ideas and opinions. Comments that are racist, hateful, sexist or attack others won’t be allowed. Just keep it clean. Do these things or you could be banned:

• Don’t name-call and attack other commenters. If you’d be in hot water for saying it in public, then don’t say it here.

• Don’t spam us.

• Don’t attack our journalists.

Let’s make this a platform that is educational, enjoyable and insightful.

Email questions to darkin@orourkemediagroup.com.

Share your opinion

Avatar

Join the conversation

Recommended for you