The main span for the new Hastings bridge is pictured during construction this week. The staging area, where the span is being assembled, is located near the lock and dam here. This image was assembled in Photoshop by merging five separate photos into one. (Photo illustration by Chad Richardson)
Read the article: Good news arrives on bridge: Contractors are aiming to have drivers on two lanes of the new bridge in 11 months
