Sections

Weather Forecast

Close
Advertisement
This is the scene in Hastings as of 6:30 a.m. Friday, Sept. 7.

Hastings bridge updates: Highway 61 closure now planned for Sept. 12-15

Email Sign up for Breaking News Alerts
news Hastings, 55033
Hastings Minnesota 745 Spiral Boulevard 55033

As news develops over the next week or so relating to the Hastings bridge, we will add to this story. This story will be updated frequently.

Advertisement
Advertisement

• The Minnesota Department of Transportation is saying that the Hastings bridge will now be closed Sept. 12-15 as the main span is moved into place. That's Wednesday-Saturday of next week.

• From the MnDOT website, here is the updated schedule:

Closures and reopenings

Thursday, Sept. 6:

Lock and Dam Road near downtown Hastings is closed at the entrance to Jaycee Park starting at noon. Access to and parking at Jaycee Park will remain available.

The pedestrian and bicycle path between Lock and Dam No. 2 and downtown Hastings is also closed.

On Friday, Sept. 7:

All through river traffic between Lock and Dam No. 2 and the CP Rail bridge east of downtown will be suspended and the boat launch at the park will close at 6 a.m.

On Saturday, Sept. 8:

Lock and Dam Road, the boat launch and path will reopen. Through river traffic will resume.

On Wednesday, Sept. 12:

Motorists traveling through the area will encounter a closure of Hwy 61 at the Mississippi River starting at 8:30 a.m. The highway will remain closed for up to 72 hours. Motorists travelling through the Hastings area should follow the signed detour using I-494, Hwy 52 and Hwy 55.

Lock and Dam Road and the pedestrian and bicycle path will close again.

All through river traffic will be suspended again.

All of these will re-open when the main span is secured.

Previous updates

• 9 a.m. Thursday: Lock and Dam Road in Hastings will be closed today at around 1 p.m. as the preparations continue for Friday morning's roll-out.

• If you are interested in seeing what the float-in may look like, you can visit the sub-contractor's website by clicking here.

• To share photos of the move with us for publication in print or online, share them with crichardson@hastingsstargazette.com or use the hashtag #hastingsbridge on Twitter.

Advertisement
Advertisement
Advertisement